Skip to main content

Construction of the TC1

Accessibility Statement

Content on this site is monitored for compliance with the latest WCAG AA standards. We are continuously improving the usability of our content and are actively working to provide a more inclusive experience for all.

Please, contact DylanMikesell@BoiseState.edu immediately if you encounter any access barriers, challenges, or require the content in another format to fully access the information.

Resource Links


Vertical TC1 Seismometer

The original TC1 (fka Slinky) vertical seismometer was encased in 3″ ABS plumbing pipe.This served two functions: (1) it enclosed the spring, protecting it from drafts;(2)it served as a skeleton or frame on which the coil and damper were hung. This version eliminated the ABS and the two ABS tees and replaced them with a single piece of 3.5″ OD acrylic tube, in this case 20″ long. 1/8″ wall thickness. However, this could be any length you wish, which would give you a longer period. A 48″ or 60″ may require a heavier base to keep from tipping. You could also use a short section of acrylic and a longer section of 3″ ABS for a longer tube.

The coil and the damper are held in place using three each, #10 -24 x 2″ brass machine screws. The acrylic tube is drilled for these, using care not to crack the acrylic. On this 20″ tube, I drilled three for the coil at 5.0″” and three for the damper at 2.5″ from the bottom of the tube, all at 120 degrees, 7/32″ or ¼” bit. You want a bit of play in the hole, so you can shift the part to the center line.

Drill a hole for the cable, to fit the cable diameter.

The coil is the standard Slinky type coil. In this case +/- 2500 turns of 38ga or 40ga copper magnet wire, and measured 700 ohms, to 2000ohms. The coil is made with a 3/4″ wrapped area.

The coil is 1″ id and 1.75″ in overall length. It is made of PVC plumbing fittings, cut to fit. Note: Use any 1″ pvc fitting, like a coupler for the rings. Use the thinner wall pvc pipe, 200 psi, and not the thicker pipe, for the body.

The damper plate is a cylinder ring of aluminum, 1″id x 1.5″od x .750″ tall.

Or copper, using a 1″ id copper pipe, cut 2″ in length, or 1″ copper pipe coupler which is precut to 2″ length. Both the coil and damper are drilled and tapped for 10-24, 2″ brass machine screws, three places each @ 120 degrees.

The spring assembly is made of a Slinky Jr. metal spring, cut in half in this case. Use a full length Slinky Jr. spring for taller acrylic tubes. On this 20″ version, use approximately 15 of the coils. The remainder coils, retained with two alum, plates.

The spring is suspended from a ¼” 20 x 4″ eyebolt, nuts, and the 3″ ABS cap.

Use this eyebolt to make minor adjustments to the magnet height.

A ¼”- 20 x 5″ iron or brass threaded rod holds three RC44 ring magnets and adjustment nuts. This hooks over a loop made in the bottom of the springs. Make sure the all magnets are NSNS……..NS, and the two nuts are positioned as shown below on the magnets. This allow for positioning the magnets up or down the rod.

The neodymium magnets RC44, are ¼”id x ¾”od x ¼” thick. Two are used for the coil and one for the damper. The number of magnets used is optional. Their position on the threaded rod is adjusted using the adjustment nuts. On the coil both magnets should enter the top of the coil and the top of the top magnet should be even with the top of the PVC. This places one magnetic pole inside the coil and one magnetic pole outside. For the damper, the magnet should be even with the top of the copper, or ¼” inside. Proper damp is when the spring will bounce only once, or twice, not repeatedly.

The legs and base are made using a 3″ ABS end cap. Drill and tap the cap, four places 8-32 for 3/4″ brass machine screws and a 1″ fender washer. The legs are made using 3/16″ x 1″ x 4″ alum. Drill one slip fit 5/32″ hole in each support, and angled the support at 120 degrees. Drill and tap a 1/4″x20 in each support. The tapped hole is for the ¼”x20x3″ eyebolts and nuts for adj. legs.

Legs

Base of seismometer…

…. showing adjustable legs used to center magnets in coil.

Base assembly

Finally, follow instructions for Assembling Your Pre-built TC1 Seismometer.

Back To Top