SUMMER PARKING LOT MAINTENANCE SCHEDULE

Summer maintenance is scheduled to begin on June 6, 2022, and will continue through August 2022.

Permit holders using these lots will be notified by email of alternate parking locations and provided detailed closure dates.

Routine maintenance is scheduled for the following areas: (dates are subject to change)

  • Riverfront Lot: (6/6/2022 – 6/10/2022)
  • Plaza East: (6/13/2022 – 6/17/2022)
  • Plaza West: (6/20/2022 – 6/24/2022)
  • Chrisway: (6/27/2022 – 7/1/2022)
  • East Stadium: (7/18/2022 – 7/22/2022)
  • West Stadium: (7/18/2022 – 7/22/2022)
  • Bronco Lane: (8/8/2022 – 8/12/2022) Remove & Replace Asphalt Project
  • Bronco Lane: (8/15/2022 – 8/19/2022) Restripe & Routine Maintenance

When maintenance begins in an area, signage, barricades and flagging will designate all or portions of the parking lot as closed. We thank you in advance for your assistance and cooperation in not entering the closed portion of the lot.